One chamber incinerator

One (MAIN) chamber only, with two doors Doors with hinges at the center LPG combustible mainly After burner and chimney don′t change MAIN Chamber dimensions [LxWxH]: 2.2m x 4.5m x 2.8m, so we can put two containers within the MAIN chamber Ok per your comment, refractory concrete and fire brick inside the chamber; feed door with refractory concrete Burning Rate:47.5–50kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash post 100kg:Max 3.8kg 1)      This type is suitable for medical waste, but how many kilos can be put in the incinerator in one time 2)      Q: Operation and maintenance costs, these costs are based on?? What if we use it every day?? 3)      How many hertz do we need for this type of incinerator 4)      Where is the oil tank in the incinerator? 5)      Is it possible to build in not the standard accessories but the high proof accessories? 6)      What are the costs when shipment is to Surinam/South America 7)      How will the inicinerator be delivered? Partly installated or do we have to install it completly?  And in addition, the other models with less burn rate capacity as TS100(PLC); TS50(PLC); TS30(PLC); TS20(PLC) and TS10(PLC), interests also our company. So, would you give also Proforma Invoices of these models in CIF Prices to Port of Abidjan.   Furthermore, as the Incinerators have to be installed at nationwide, there are always great power cuts in our country. So, we would like to know if you can supply each Incinerator with a diesel engine (generator) which power is adapted to the power of the Incinerator unit?

One chamber incinerator

One (MAIN) chamber only, with two doors Doors with hinges at the center LPG combustible mainly After burner and chimney don′t change MAIN Chamber dimensions [LxWxH]: 2.2m x 4.5m x 2.8m, so we can put two containers within the MAIN chamber Ok per your comment, refractory concrete and fire brick inside the chamber; feed door with refractory concrete Burning Rate:47.5–50kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash post 100kg:Max 3.8kg 1)      This type is suitable for medical waste, but how many kilos can be put in the incinerator in one time 2)      Q: Operation and maintenance costs, these costs are based on?? What if we use it every day?? 3)      How many hertz do we need for this type of incinerator 4)      Where is the oil tank in the incinerator? 5)      Is it possible to build in not the standard accessories but the high proof accessories? 6)      What are the costs when shipment is to Surinam/South America 7)      How will the inicinerator be delivered? Partly installated or do we have to install it completly?  And in addition, the other models with less burn rate capacity as TS100(PLC); TS50(PLC); TS30(PLC); TS20(PLC) and TS10(PLC), interests also our company. So, would you give also Proforma Invoices of these models in CIF Prices to Port of Abidjan.   Furthermore, as the Incinerators have to be installed at nationwide, there are always great power cuts in our country. So, we would like to know if you can supply each Incinerator with a diesel engine (generator) which power is adapted to the power of the Incinerator unit?

Refractory constructions incinerator

* Burning Rate                                                     (50-120kg/hour) * Minimum Operating Temperature                (850°ϲ(Primary combustion) * Maximum Operating Temperature               (1450°ϲ(Afterburner chamber) * Secondary Burning Capacity                         (Compulsory) * Density Insulation                                           (20mm high) * Refractory Casting                                          (Minimum 65mm) * Heavy duty refracting lining to withstand    (1500°ϲ) * Average burn out time: Maximum                (3.0 hours) * Fuel Type                                                          (Diesel) * Fuel Consumption in L/hr:                            (7.5 to 9) * Residence time in secondary chamber     (2 sec.) * Residue ash post 100kg                               (Max. 3.8kg) * Installation period                                            (Maximum 7days) Type : Refractory constructions Steel Structure 400+ Silica board + Fire Brick and Castable between Size : Outside – W 740 x L 1112 x H 790 / Inside – W 400 x L 800 x H 560 (mm) Fire load of Combustion volume : 0.18 m3 Fire table area : 0.32 m2 Material : SS400 x 6.0T, Silica Board, Fire Brick (SK-36), Castable (HACT-160) Temperature : 700 ~ 900 ℃ Residual gas combustion in secondary chambers : ≥ 2sec Input door size : W 200 x H 200 (mm) Ash door size : W 300 x H 400 (mm) Type : Refractory constructions Steel Structure 400+ Silica board + Fire Brick and Castable between Size : Outside – W 740 x L 1112 x H 745 / Inside – W 400 x L 800 x H 600 (mm)   Fire load of Combustion volume : 0.19 m3   Fire table area : 0.32 m2 Material :  SS400 x 6.0T, Silica Board 50T, Fire Brick (SK-36), Castable (HACT-160) …

Pre-assembled containerized type waste incinerator

Pre-assembled, containerized type  Burning rate: 100 – 120kg / hour medical waste incinerator  Minimum operating temperature: 8500c   (Primary combustion) Maximum operating temperature: 14500c  (afterburner chamber) Secondary Burning capacity: Compulsory. Density …

medical incinerator

medical incinerator is incineration equipment for the waste from hospital, clinic,laboratory or other related department. the medical waste including plastic material like syringe, Infusion set, medical tube and medical dressing, …

medical waste incinerator for sale

Average 20%-25% of the total waste generated by healthcare establishments is regarded as hazardous and may create a variety of health and environmental risks if not managed and destroyed in …

medical waste incinerators manufacturers

HICLOVER, medical waste incinerators manufacturers, is now offering a full range of medical waste incinerators, designed to provide efficient waste destruction, utilizing best available technologies and environmentally friendly process. Due …